Skip to main content
Accessibility
Line height
Text size
Contrast
Other options
E-services
  • Client portal
  • For landowners and network service customers
  • For those connecting to the main grid
  • Renewable Energy Information System
EST
Elering logo
Menu Elering logo

Päis Megamenüü

  • Services
    • Connecting to the electricity network
      • Network development and fixed connection fee
      • Preliminary feasibility study and procurement documents
      • Connection fees
      • Generating unit tests
      • Construction of a connection point
      • Flexible connection
      • Application and contract
      • Connection capacity application e-Gridmap
      • Connection conditions and legislation
      • Legislation
      • Approval
      • Underutilisation fee for connecting contracts
    • Connecting to the gas network
      • Connection fee
      • Application and contract
      • Technical possibilities for connecting
      • Establishment of grid connection
      • Connection conditions and legislation
    • Electricity network service
      • Price list and standard terms and conditions
      • Quality
      • Reconstruction of the network
      • Network service portal
      • Underutilisation fee in case of permanent network contract
    • Gas network service
      • Strategic reserve tax
    • Electricity balancing service
      • Balance agreement
      • Balancing service fees
      • Regulations and legislation
      • Balancing service
      • Aggregation service
    • Gas balancing service
      • Gas balance administration
      • Gas balance agreement
    E-Services
    • Client portal Measurement point data and measurement data
    • For landowners and for network service customers Toleration fee, network service customer invoices and contracts
    • For those connecting to the transmission network Connection to the electricity grid at 110 kV and 330 kV voltage levels
  • Infrastructure
    • Elering’s infrastructure
      • Elering’s infrastructure
      • Gas transmission system
      • Infrastructure-related impact
    • Protection zones
      • Permit to operate in a protection zone
      • Approval of a permit for special cargo
      • Protection zone maintenance
      • Protection zone for an electrical installation
      • Protection zone for a gas installation
      • Approvals
    • Land use
      • Planning rights
      • Toleration fee
    • Major projects
      • Synchronisation with Continental Europe
      • European Union Recovery and Resilience Facility projects
      • EstLink 3
      • The fourth Estonian-Latvian power connection
      • Nordic-Baltic Hydrogen Corridor
    • Completed major projects
      • Third Estonian-Latvian connection
      • Tartu-Viljandi-Sindi line
      • Emergency reserve plants
    • Design towers
      • Design tower Soorebane
      • Design tower Sookurg
      • Design tower Sookureke
    • Electrical installation safety
      • Electrical installation safety requirements
      • Electrical safety qualification
      • Safety notice
    • Gas installation safety
    E-Services
    • For landowners and for network service customers Toleration fee, network service customer invoices and contracts
    • For those connecting to the transmission network Connection to the electricity grid at 110 kV and 330 kV voltage levels
  • Energy system
    • Security of electricity supply
      • Measures to ensure security of supply
      • Security of supply reports and conferences
    • Security of gas supply
      • Ensuring security of gas supply in an emergency
    • Power system
      • System operation
      • Control centre
      • Electricity consumption and generation
      • Regional coordination
    • Gas system
      • Quality of network gas
    • Energy market
      • Cross-border electricity trade
      • Cross-border gas trade
      • Congestion income
      • Power exchange
      • Gas exchange
      • Energy and capacity market for balancing services
      • Electricity data exchange
      • Gas data exchange
      • Market supervision under the REMIT Regulation
      • Electricity Market Handbook
      • Gas Market Handbook
    • Development plans
      • Development plan of the electricity transmission system
      • Development plan of the gas transmission system
    • Public consultations
      • Closed consultations
      • Open consultations
  • Renewable energy
    • Renewable energy
    • Grants
      • Biomethane aid
      • Investment aid
      • Renewable energy charge
      • Grants FAQ
    • Renewable electricity support
      • Terms and conditions of support
      • Profitability assessment
      • Registration of a production device
      • Applying for support
      • Direct line producers
      • Important deadlines
      • Principles for projects over 1 MW
    • Reverse auction
      • Bid form
      • Results
      • Reverse auction FAQ
      • Notice of a reverse auction
      • Legislation
    • Origin of energy
      • Proof of origin portal for electricity
      • Residual mix
      • Gaseous fuels
      • Transport statistics
    • Guarantees of origin
      • Guarantees of origin for electricity
      • Guarantees of origin for biomethane
      • Guarantees of origin FAQ
    • Production and forecast
      • Concepts
    • Renewable energy information systems
      • Authorisation and user roles
    E-Services
    • Renewable energy information system Grants and guarantees of origin

Lihtmenüü

  • About Elering
  • Work and career
  • News
  • Contacts

Breadcrumb

  • Home
  • Services
  • Connecting to the gas network
  • Connection conditions and legislation

Külg Megamenüü

  • Connecting to the gas network
    • Connection fee
    • Application and contract
    • Technical possibilities for connecting
    • Establishment of grid connection
    • Connection conditions and legislation

Külg Lihtmenüü EST

Connection conditions and legislation

Share

Copy

Connection to the gas network is governed by the legislation of the Republic of Estonia, specifically the Natural Gas Act and the Minister of Economic Affairs and infrastructure Regulation "Network code governing the operation of the gas market".

  • Natural Gas Act
  • Network Rules for the Functioning of the Gas Market (in Estonian)
  • When issuing new connection offers, the connection conditions submitted for public consultation (in Estonian) apply in accordance with the logic derived from §18(4) of the Natural Gas Act: “Conditions for Connection to the Gas Transmission Network of Elering AS” (in Estonian) (valid from 15 April 2025, approved by Elering Management Board Decision No. 28-2/2025).
  • By Management Board Decision No. 28-2/2025, Elering AS declared the “Conditions for Connection to the Gas Transmission Network of Elering AS” (in Estonian) (which were valid from 1 February 2023 and established by Elering Management Board Decision No. 9-5/2) invalid as of 15 April 2025.
  • “Methodology for Calculating the Connection Fee to the Gas Transmission Network of Elering AS” (in Estonian) (approved by the Competition Authority Decision No. 7-10/2017-017 of 3 November 2017).

Attachments

Elering AS gaasi liitumise tingimused 2025.pdf
1.9MB | pdf | 04.14.2025
Elering AS gaasi liitumise taotluse vorm 2025.docx
84KB | docx | 04.14.2025
Elering AS gaasi ülekandevõrgu liitumistasu ja tarbimis- ning tootmistingimuste muutmise tasu arvestamise metoodika.docx
30KB | docx | 08.02.2019

Last modified 06.17.2025

Share

Copy

General Contact

Information available on weekdays from 8:00 AM to 4:30 PM

+372 7151 222 or Write us

High-voltage power line and gas transmission network emergencies

Please contact us only regarding transmission network issues (we answer this phone 24/7)

60 56 825 or Write us

Corruption suspicion reporting line

In case of fraud or corruption suspicions, anonymous reports can be submitted.

6007 077 or Write us
Elering Ltd.
  • Kadaka Road 42, 12915, Tallinn
  • +372 7151 222

Weekdays from 8:00 AM to 4:30 PM

  • E-mail: [email protected]
  • Customer support: [email protected]
  • Billing: [email protected]
  • Customer Portal
  • Network customers
  • For landowners
  • Grid connection
FAQ

FAQ

Find answers to frequently asked questions

  • Processing of personal data
  • Cookies
  • Copyright © Elering 2025
  • Register code: 11022625/KMKR EE100889639
  • EIC: 10X1001A1001A39W; ACER CEREMP; A00026797.EE
elering logo

What are you looking for?