Connection conditions and legislation
Connection to the gas network is governed by the legislation of the Republic of Estonia, specifically the Natural Gas Act and the Minister of Economic Affairs and infrastructure Regulation "Network code governing the operation of the gas market".
Regulations:
- Natural Gas Act
- Network Rules for the Functioning of the Gas Market (in Estonian)
- “Conditions for Connection to the Gas Transmission Network of Elering AS” (in Estonian) (valid 7 August 2026, approved by Elering Management Board Decision No. 59-1/2026).
- “Methodology for calculating the connection fee to the natural gas transmission network and the fee for changing consumption and production conditions.pdf” (approved by the Competition Authority Decision No. 7-10/2017-017 of 3 November 2017).
- "Conditions for one-time connection to the Elering AS gas transmission network in Pakrineeme 2025.07.01.pdf" (valid 1 July 2025, approved by Elering Management Board Decision No. 51-4/2025)
Elering AS Conditions for Connection to the Gas Transmission Network
As of 7 August 2026, the updated Elering AS conditions for connection to the gas transmission network are in force.
The conditions for connection to the Elering AS gas transmission network (hereinafter connection conditions) were updated due to the declining capacity of Elering’s gas transmission network dead-end pipeline system, which, in the case of a request for significant additional consumption capacity, would require extensive network reinforcement works. The updated connection conditions enable the provision of economically viable connection offers by allowing connection to the transmission network with flexible consumption-direction capacity. When connecting with flexible consumption capacity, the applicant is not required to cover the costs of increasing the capacity of the transmission network; however, in the absence of network resource limitations, the network connection can be used up to the full extent of the requested flexible consumption capacity.
At existing connection points, connection with flexible consumption capacity requires reconstruction works to enable gas flow limitation. The exact scope of the works depends on the existing network connection and will be determined during the preparation of the connection offer. In addition, clarifications have been made to the connection conditions to make the technical solution of the network connection clearer than before.
From 22 June 2026 to 23 July 2026, Elering conducted a public consultation with market participants regarding the amendments to the connection conditions prior to their implementation. No proposals or comments were submitted to Elering during the consultation.
More information about the public consultation with a more precise overlook of the amendments is available here.
Conditions for connecting to the gas transmission network
Conditions for connecting to the gas transmission network
Conditions for one-time connection to the Pakrineeme gas transmission network
Conditions for one-time connection to the Pakrineeme gas transmission network
Conditions for one-time connection to the Elering AS gas transmission network in Pakrineeme 2025.07.01.pdf
Membership application form for one-time membership in Pakrineeme.docx
Transmission System Operator and Pakrineeme Gas Facility Transmission Agreement
Calculation of transmission capacities of the Pakrineeme connection point.pdf