Skip to main content
Accessibility
Line height
Text size
Contrast
Other options
E-services
  • Client portal
  • For landowners and network service customers
  • For those connecting to the main grid
  • Renewable Energy Information System
EST
Elering logo
Menu Elering logo

Päis Megamenüü

  • Services
    • Connecting to the electricity network
      • Network development and fixed connection fee
      • Preliminary feasibility study and procurement documents
      • Connection fees
      • Generating unit tests
      • Construction of a connection point
      • Flexible connection
      • Application and contract
      • Connection capacity application e-Gridmap
      • Connection conditions and legislation
      • Legislation
      • Approval
      • Underutilisation fee for connecting contracts
    • Connecting to the gas network
      • Connection fee
      • Application and contract
      • Technical possibilities for connecting
      • Establishment of grid connection
      • Connection conditions and legislation
    • Electricity network service
      • Price list and standard terms and conditions
      • Quality
      • Reconstruction of the network
      • Network service portal
      • Underutilisation fee in case of permanent network contract
    • Gas network service
      • Strategic reserve tax
    • Electricity balancing service
      • Balance agreement
      • Balancing service fees
      • Regulations and legislation
      • Balancing service
      • Aggregation service
    • Gas balancing service
      • Gas balance administration
      • Gas balance agreement
    E-Services
    • Client portal Measurement point data and measurement data
    • For landowners and for network service customers Toleration fee, network service customer invoices and contracts
    • For those connecting to the transmission network Connection to the electricity grid at 110 kV and 330 kV voltage levels
  • Infrastructure
    • Elering’s infrastructure
      • Elering’s infrastructure
      • Gas transmission system
      • Infrastructure-related impact
    • Protection zones
      • Permit to operate in a protection zone
      • Approval of a permit for special cargo
      • Protection zone maintenance
      • Protection zone for an electrical installation
      • Protection zone for a gas installation
      • Approvals
    • Land use
      • Planning rights
      • Toleration fee
    • Major projects
      • Synchronisation with Continental Europe
      • European Union Recovery and Resilience Facility projects
      • EstLink 3
      • The fourth Estonian-Latvian power connection
      • Nordic-Baltic Hydrogen Corridor
    • Completed major projects
      • Third Estonian-Latvian connection
      • Tartu-Viljandi-Sindi line
      • Emergency reserve plants
    • Design towers
      • Design tower Soorebane
      • Design tower Sookurg
      • Design tower Sookureke
    • Electrical installation safety
      • Electrical installation safety requirements
      • Electrical safety qualification
      • Safety notice
    • Gas installation safety
    E-Services
    • For landowners and for network service customers Toleration fee, network service customer invoices and contracts
    • For those connecting to the transmission network Connection to the electricity grid at 110 kV and 330 kV voltage levels
  • Energy system
    • Security of electricity supply
      • Measures to ensure security of supply
      • Security of supply reports and conferences
    • Security of gas supply
      • Ensuring security of gas supply in an emergency
    • Power system
      • System operation
      • Control centre
      • Electricity consumption and generation
      • Regional coordination
    • Gas system
      • Quality of network gas
    • Energy market
      • Cross-border electricity trade
      • Cross-border gas trade
      • Congestion income
      • Power exchange
      • Gas exchange
      • Energy and capacity market for balancing services
      • Electricity data exchange
      • Gas data exchange
      • Market supervision under the REMIT Regulation
      • Electricity Market Handbook
      • Gas Market Handbook
    • Development plans
      • Development plan of the electricity transmission system
      • Development plan of the gas transmission system
    • Public consultations
      • Closed consultations
      • Open consultations
  • Renewable energy
    • Renewable energy
    • Grants
      • Biomethane aid
      • Investment aid
      • Renewable energy charge
      • Grants FAQ
    • Renewable electricity support
      • Terms and conditions of support
      • Profitability assessment
      • Registration of a production device
      • Applying for support
      • Direct line producers
      • Important deadlines
      • Principles for projects over 1 MW
    • Reverse auction
      • Bid form
      • Results
      • Reverse auction FAQ
      • Notice of a reverse auction
      • Legislation
    • Origin of energy
      • Proof of origin portal for electricity
      • Residual mix
      • Gaseous fuels
      • Transport statistics
    • Guarantees of origin
      • Guarantees of origin for electricity
      • Guarantees of origin for biomethane
      • Guarantees of origin FAQ
    • Production and forecast
      • Concepts
    • Renewable energy information systems
      • Authorisation and user roles
    E-Services
    • Renewable energy information system Grants and guarantees of origin

Lihtmenüü

  • About Elering
  • Work and career
  • News
  • Contacts

Breadcrumb

  • Home
  • Services
  • Electricity balancing service
  • Balancing service fees

Külg Megamenüü

  • Electricity balancing service
    • Balance agreement
    • Balancing service fees
    • Regulations and legislation
    • Balancing service
    • Aggregation service

Külg Lihtmenüü EST

Balancing service fees

Share

Copy

The system operator keeps records of the administrative costs of the balancing service in accordance with the principles set out in the legislation and the Competition Authority's Methodology. With the price component of the administrative costs of the balancing service, the system operator covers the administrative costs related to the provision of the balancing service, as forecasted by financial year.

 

Price components of administrative costs: Prices  
Imbalance tariff €/MWh  0.81  
Tariff for production in the balance portfolio €/MWh 0.08  
Tariff for consumption in the balance portfolio €/MWh 0.08  

 

Balancing service tariffs do not include the imbalance price during the balancing period. The imbalance price is based on the cost of the balancing energy activated in a specific period and is published here: Balancing energy prices. 

Attachments

Bilansiteenuse hinna arvutamise ühtne metoodika
145KB | pdf | 01.31.2025
FINAL_Impact analysis of balance service fee design in the Estonian electricity system.pdf
1.1MB | pdf | 04.30.2025

Last modified 05.19.2025

Share

Copy

General Contact

Information available on weekdays from 8:00 AM to 4:30 PM

+372 7151 222 or Write us

High-voltage power line and gas transmission network emergencies

Please contact us only regarding transmission network issues (we answer this phone 24/7)

60 56 825 or Write us

Corruption suspicion reporting line

In case of fraud or corruption suspicions, anonymous reports can be submitted.

6007 077 or Write us
Elering Ltd.
  • Kadaka Road 42, 12915, Tallinn
  • +372 7151 222

Weekdays from 8:00 AM to 4:30 PM

  • E-mail: [email protected]
  • Customer support: [email protected]
  • Billing: [email protected]
  • Customer Portal
  • Network customers
  • For landowners
  • Grid connection
FAQ

FAQ

Find answers to frequently asked questions

  • Processing of personal data
  • Cookies
  • Copyright © Elering 2025
  • Register code: 11022625/KMKR EE100889639
  • EIC: 10X1001A1001A39W; ACER CEREMP; A00026797.EE
elering logo

What are you looking for?