Minister of Economic Affairs and Communications Regulation No. 42 of 6 April 2005 approved the quality requirements for network services, which were amended by Regulation No. 51 of 9 June 2006.

The requirements for security of electricity supply define the time of restoring electricity supply in the event of power outages caused by malfunctions. An outage caused by malfunctions in the transmission system must be eliminated within two hours if the electricity supply to the consumption point is ensured through two or more 110 kV transformers or power lines, and within 120 hours if the electricity supply to the consumption point is ensured through one 110 kV transformer or power line.

Quality requirements for network services have been established by Minister of Economic Affairs and Communications Regulation No. 104:

  • The network operator is obligated to register and keep separate records of all service operations set out in subsection 3 (3) of the “Network service quality requirements” and the time spent on carrying out each individual operation;
  • The network operator is obligated to register and keep separate records of all outages registered at regional and individual consumption points and their duration, distinguishing between planned outages, outages caused by malfunctions and force majeure;
  • The network operator is obligated to register and keep separate records of all complaints received from consumers related to the quality of electricity supply (including voltage quality). At the end of each financial year, the network operator submits data to the Competition Authority on the number of consumption points where the voltage quality does not meet the standard specified in section 6 of the “Network service quality requirements”;
  • In the event of outages caused by force majeure, the network operator provides separate explanations for all incidents.

The most important criteria for service quality are the numbers of shutdowns and the amount of energy not supplied to clients:

 

  2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013
Shutdowns, pcs 130 127 100 108 113 126 87 116 100 134 166 261
Energy not supplied, MWh 69,6 55,4 49,7 13,8 10,5 216,5 18,5 44,2 67,5 11,9 27,56 58,41