In order to increase the security of supply of Saaremaa and Hiiumaa islands, Elering will replace the second (and final) overhead transmission line on the Väinatamm Causeway, which will allow for the...
Elering, AST and Litgrid, the electricity system operators of the Baltic States, reduced the transmission capacity for electricity import from Russia to 300 megawatts as a risk mitigation measure. The...
The support allocated from the Recovery and Resilience Facility of the European Commission allows adding 310 megawatts (MW) of new renewable energy capacities to the transmission network administered...
This webinar gives an overview on the resource adequacy situation in the Nordic and Baltic Sea area and the takeaways that TSOs find by analysing the results of Pan-European resource adequacy studies...
According to Elering’s data, Estonian power plants produced 6.3 terawatt-hours of electricity in the previous year, which is 32 percent more than in 2020. Consumption increased by six percent and...
On Wednesday, January 26, the coordinating committee of the key EU fund for infrastructure Connecting Europe Facility (CEF) evaluated in its final selection process and approved the proposal submitted...