Before synchronization of the generating module, the producer must send to Elering for endorsement the design documentation on the electrical part of the generating module, which must receive endorsement from Elering seven days before the synchronization of the generating module.

The electrical design documentation shall include:

The measurement and remote control signals to be sent out to the TSO in real time must function and be tested from the energy system control centre before synchronization of the generating module, and after synchronization along with the new generating module operating in parallel with the system within three months of synchronization.

After conformity testing, the producer must submit to the TSO a verified PSS/E model, and in the case of generating modules over 10 MW, the PSCAD model as well, each prepared in accordance with the guidelines Requirements for preparation and modelling of the customer’s electrical design project.

What are you looking for?

All Lihtlehekülg News Käsiraamat Maintenance Konsultatsioon Kontaktid