For consumer installations, category B and C gas installations (0.1 to 16 bar consumers) can join the network.

Upon agreement with a network operator, the customer has the possibility of establishing, on the territory of the network operator’s installation, a consumer gas installation, which will remain the property of the network operator. More detailed terms and conditions shall be agreed upon in the connection contract.

For producer connections, only category D gas installations can connect to the network (all producers whose connection points are established over 16 bar pressure).

 

Principles of connecting to the network operator:

 

Upon connection to a new GJJ, the network operator shall establish all of the buildings necessary for connection pursuant to the list specified in Figure 1 (pos. 1-7).

The connection point is a welding junction on the shut-off valve belonging to the network operator (pos. 6 on figure 1). For additional information, see clause 3.5.2 of the connection conditions.

Joonis%201.jpg

 

In exchange for the connection fee, the network operator shall expand the existing GJJ building, if technically feasible, by installing the equipment and systems necessary for the connection pursuant to the list specified in Figure 2 (pos. 9-13).

The connection point is a welding junction on the shut-off valve belonging to the network operator (pos. 12 on figure 2). For additional information, see clause 3.5.3 of the connection conditions.

joonis%202.jpg

 

Upon connection to a new GJJ, the network operator shall establish, in exchange for the connection fee, a new GJJ building and install in the building all of the equipment and systems necessary for the network connection, pursuant to the list specified in Figure 2.1 (pos. 9-13). The aforementioned technical solution shall be implemented in a situation where it is not expedient to execute the technical solution set out by the existing GJJ.

If the existing GJJ territory likewise does not support the placement of a new GJJ building, the network operator shall, in exchange for the connection fee, Upon connection to a new GJJ, the network operator shall establish, in exchange for the connection fee, a new GJJ on to the existing branch pipe along with the equipment and systems necessary for connection, pursuant to the list specified in Figure 2.1.

The connection point is a welding junction (pos. 13 on figure 2.1) on the shut-off valve belonging to the network operator (pos. 12 on figure 2.1).  For additional information, see clause 3.5.4 of the connection conditions.

 

Joonis 2.1. Juurdeehitatud GJJ võrguühenduse näidisskeem

 

In exchange for the connection fee, the network operator shall establish all of the buildings necessary for network connection pursuant to the list specified in Figure 3 (pos. 1-5 of Figure 3). 1-5).

The connection point is a welding junction (pos. 5 on figure 3) on the shut-off valve belonging to the network operator (pos. 4 on figure 3). 5). For additional information, see clause 3.5.5 of the connection conditions.

 

joonis%203.jpg

 

In exchange for the connection fee, the network operator shall establish the buildings necessary for network connection pursuant to the list specified in Figure 4 (pos. 1-5 of Figure 4). 1-5).

The connection point is a welding junction (see pos. 5) on the shut-off valve belonging to the network operator (pos. 4 on figure 4).  For additional information, see clause 3.5.6 of the connection conditions.

 

joonis%204.jpg

For producer connections, the network operator shall, exchange for the connection fee, establish the buildings necessary for network connection pursuant to the list specified in Figure 5 (pos. 3-8 of Figure 5). 3-8).

The connection point is a welding junction (pos. 3, figure 5) prior to the shut-off valve belonging to the network operator (pos. 4 on figure 5). 3). For additional information, see clause 3.5.6 of the connection conditions

 

joonis%205.jpg

Upon connection to a new GJJ, the network operator shall establish all of the buildings necessary for connection pursuant to the list specified in Figure 1 (pos. 1-7).

The connection point is a welding junction on the shut-off valve belonging to the network operator (pos. 6 on figure 1). For additional information, see clause 3.5.2 of the connection conditions.

Joonis%201.jpg

 

In exchange for the connection fee, the network operator shall expand the existing GJJ building, if technically feasible, by installing the equipment and systems necessary for the connection pursuant to the list specified in Figure 2 (pos. 9-13).

The connection point is a welding junction on the shut-off valve belonging to the network operator (pos. 12 on figure 2). For additional information, see clause 3.5.3 of the connection conditions.

joonis%202.jpg

 

Upon connection to a new GJJ, the network operator shall establish, in exchange for the connection fee, a new GJJ building and install in the building all of the equipment and systems necessary for the network connection, pursuant to the list specified in Figure 2.1 (pos. 9-13). The aforementioned technical solution shall be implemented in a situation where it is not expedient to execute the technical solution set out by the existing GJJ.

If the existing GJJ territory likewise does not support the placement of a new GJJ building, the network operator shall, in exchange for the connection fee, Upon connection to a new GJJ, the network operator shall establish, in exchange for the connection fee, a new GJJ on to the existing branch pipe along with the equipment and systems necessary for connection, pursuant to the list specified in Figure 2.1.

The connection point is a welding junction (pos. 13 on figure 2.1) on the shut-off valve belonging to the network operator (pos. 12 on figure 2.1).  For additional information, see clause 3.5.4 of the connection conditions.

 

Joonis 2.1. Juurdeehitatud GJJ võrguühenduse näidisskeem

 

In exchange for the connection fee, the network operator shall establish all of the buildings necessary for network connection pursuant to the list specified in Figure 3 (pos. 1-5 of Figure 3). 1-5).

The connection point is a welding junction (pos. 5 on figure 3) on the shut-off valve belonging to the network operator (pos. 4 on figure 3). 5). For additional information, see clause 3.5.5 of the connection conditions.

 

joonis%203.jpg

 

In exchange for the connection fee, the network operator shall establish the buildings necessary for network connection pursuant to the list specified in Figure 4 (pos. 1-5 of Figure 4). 1-5).

The connection point is a welding junction (see pos. 5) on the shut-off valve belonging to the network operator (pos. 4 on figure 4).  For additional information, see clause 3.5.6 of the connection conditions.

 

joonis%204.jpg

For producer connections, the network operator shall, exchange for the connection fee, establish the buildings necessary for network connection pursuant to the list specified in Figure 5 (pos. 3-8 of Figure 5). 3-8).