Estonia’s electricity production fell in July by eight per cent compared with the year prior to a total of 769 gigawatt-hours. Electricity consumption totalled 571 gigawatt-hours, remaining at a...
On Monday, Elering concluded a contract with Empower AS and Leonhard Weiss Energy AS for the design and construction of the main part of the third Estonia-Latvia electricity connection, or the Harku...
Elering AS and the other TSOs of the Baltic Capacity Calculation Region launch a public consultation via ENTSO-E on the proposal for Capacity Calculation Methodology for both the Day-ahead and...
In July, the difference of the day-ahead electricity exchange price between the Estonian price area and the Latvian and Lithuanian price areas fell to 1.94 euros, compared to the 7.71 euros this June...
Elering concluded an agreement with Merko Infra on Monday for the renovation of the Ranna substation in Tallinn’s city centre, which will cost around two million euros excluding VAT. The Ranna...
According to Elering’s smart grid statistics, around 1000 consumption points changed electricity seller from 1 August. In total, Estonia has about 722 000 consumption points with an electricity...