The repairs of the Balticconnector offshore pipeline have been completed according to plans, and the integrity and strength of the pipe have been tested with a water pressure test. Alongside the sea...
According to the economic results of Elering for the previous year, the reliability of the Estonian electricity transmission network was close to the maximum. Throughout the year, Elering’s...
Periodic inspection, maintenance, and repair of gas pipelines, as required by the regulations, are vital for ensuring the long-term reliable operation of the gas transmission infrastructure. The...
Construction work on the second submarine cable in the Väike Väin Strain as ordered by Elering began this week. Once the cable is completed, the dam between Muhu and Saaremaa will be freed from the...
Elering updates login methods to its e-services to provide secure authentication and a good user experience to service users. Due to this, the possibility to log in to Elering's e-services using bank...
The difficult geological conditions and the cable's unique technical solution make the repair of the submarine power cable between Estonia and Finland take time. Reigo Kebja, a member of Elering's...