Investments planned from the volume for increasing the capacity for renewable energy connection
Reconstruction of L356 Mustvee-Paide
Reconstruction of L357 Kiisa-Paide overhead line
Construction of L175 Leisi-Sikassaare on separate pylon from L176 Sikassaare-Valjala line
Increasing clearances of L174 Rõuste-Leisi
Replacement of conductor and increasing clearance of L177 Orissaare-Valjala
Increasing clearances of L176 Sikassaare-Valjala
Increasing clearances of L175A Valjala branch
Increasing clearances of L175 Sikassaare-Leisi
Construction of 110 kV overhead line of L036 Rõuste-Virtsu
Construction of 110 kV overhead line of L170 Lihula-Virtsu
Renovation of L017 Kiisa-Rummu
Increasing clearances of L185 Kiisa-Kohila
Increasing clearances of L186 Kohila-Rapla
Construction of L173 Võiküla-Orissaare parallel line
Lihula 330/110 kV substation
Expansion of Orissaare 110 kV substation
Section of L174 Rõuste-Leisi 110 kB cable line in Väike Strait – construction
The investments to be made in the context of the programme are depicted on the figure below.
Figure 1. Investments to increase the capacity of distributed and renewable electricity in West Estonia and the islands
Figure 2. Investments that allow increasing the capacity of the western Estonian and islands‘ dispersed and renewable power grid – mainland section
Figure 3. Investments that allow increasing the capacity of the western Estonian and islands‘ dispersed and renewable power grid – islands section