The latest production adequacy report from Elering, the Estonian TSO, considers that the demand of Estonian electricity consumers will be covered by domestic production this winter in both ordinary...
In the third quarter of this year, production of renewable energy accounted for 13% of Estonian electricity consumption, meaning that the share of consumption supplied by renewable sources has risen...
Elering’s revenues in the third quarter of this year were 17.2 million euros, operating profit was 242 thousand euros and net profit was -2.4 million euros. Elering’s CFO Peep Soone said the results...
On 25 October, rector of Tallinn University of Technology Andres Keevallik and Elering CEO Taavi Veskimägi signed a joint letter of intent to establish training for power engineers on the basis of...
Last month the biggest impact on trading in the Estonian price area of Nord Pool Spot (NPS) came from the shortages in Latvia and cheap Norwegian hydro-energy, which pushed down prices in both the...
Estonian Transmission System Operator (TSO) Elering together with other Nordic TSOs have launched a new online map that shows real time data of the electricity systems in Nordic countries. This...