Skip to main content

Existing conditions for connecting to the grid

According to the Elering conditions for connecting to the grid all proceedings related to the connection process, coordination, and preliminiary studies as also the data exhange related to these activities are carried out in the transmission grid connection information system.

 

 

Forms of data transmitted during the connection process
Data submitted by the application for connection  
Annex 3- Testing.docx  
Annex 5-Guide for writing electrical and modelling requirements for electrical installations.docx  

 

 

Earlier technical requirements and rules for connecting to the grid
Document Valid
Annex 1 - technical requirements and rules (Est) 24.02.2014 - 31.05.2016
Annex 1 - technical requirements and rules (Est) until 24.02.2012
Technical requirements and rules (Est)  
Technical requirements - tables (Est) 01.01.2013 - 31.05.2016
Technical requirements - tables (Est)  

 

Earlier standard contracts
Document Valid
Annex 2 - standard contract (Est) 01.01.2013 - 31.05.2016

 

Earlier methodologies for calculating the connection fees and the fee for changing production or consumption conditions 

Document Valid
Calculating the connection fees and the fee for changing production or consumption conditions (Est) until 31.05.2016
Methodology for calculating the connection fees and the fee for changing production or consumption conditions (Est) 2015

 

 

Earlier technical requirements and rules for connecting to the grid
Document Valid
Annex 1 - technical requirements and rules (Est) 24.02.2014 - 31.05.2016
Annex 1 - technical requirements and rules (Est) until 24.02.2012
Technical requirements and rules (Est)  
Technical requirements - tables (Est) 01.01.2013 - 31.05.2016
Technical requirements - tables (Est)  

 

Earlier standard contracts
Document Valid
Annex 2 - standard contract (Est) 01.01.2013 - 31.05.2016

 

Earlier methodologies for calculating the connection fees and the fee for changing production or consumption conditions 

Document Valid
Calculating the connection fees and the fee for changing production or consumption conditions (Est) until 31.05.2016
Methodology for calculating the connection fees and the fee for changing production or consumption conditions (Est) 2015

Mille kohta sa infot otsid?

Kõik Basic page Book page Hooldustööd Uudis